  "value": "schedule_delay_analyzer",
  "label": "Analyze Schedule Delays",
  "description": "Analyze construction schedule delays for time extension claims. Provide schedule data and delay events to receive delay analysis, concurrent delay assessment, and time impact documentation for contract claims.",
  "name": "Schedule Delay Analyzer",
  "category": "Construction",
  "type": "Industry",
  "config": {
    "temperature": 12,
    "frequencyPenalty": 0,
    "disableRAG": true,
    "prompt": [
      {
        "role": "user",
        "content": "<role>Act as a construction scheduling expert with expertise in delay analysis and time extension claims.</role> <task>Analyze the schedule delay based on the information I provide. Generate: (1) delay event identification and categorization, (2) critical path impact analysis, (3) concurrent delay assessment, (4) excusable vs compensable determination, (5) time impact calculation methodology, (6) float consumption analysis, (7) acceleration considerations, (8) supporting documentation requirements, (9) time extension request narrative, and (10) recommended claim approach.</task> <format>Present as a delay analysis report suitable for contract claim submission.</format>"
      }
    ]
  }
}