{
  "value": "punch_list_generator",
  "label": "Generate Punch List",
  "description": "Create organized punch lists for construction project closeout. Provide inspection notes and deficiencies to receive categorized punch lists with location references, responsible parties, priority levels, and completion tracking format.",
  "name": "Punch List Generator",
  "category": "Construction",
  "type": "Industry",
  "config": {
    "temperature": 10,
    "frequencyPenalty": 0,
    "disableRAG": true,
    "prompt": [
      {
        "role": "user",
        "content": "<role>Act as a construction project manager specializing in project closeout and quality control.</role> <task>Create a punch list based on the deficiencies I describe. Include: (1) item numbering and categorization by trade/area, (2) specific location references, (3) clear deficiency description, (4) specification or drawing reference, (5) responsible subcontractor assignment, (6) priority level (safety/function/cosmetic), (7) estimated completion time, (8) reinspection requirements, and (9) back-charge applicability.</task> <format>Structure as a trackable punch list with status columns.</format>"
      }
    ]
  }
}